Simpson Co. produces three products: Earth, Wind, and Fire. Earth requires 80 machine setups, Wind requires 60 setups, and Fire requires 180 setups. Simpson has identified an activity cost pool with allocated overhead of $480,000 for which the cost driver is machine setups. How much overhead is assigned to each product?
Hi there! Click one of our representatives below and we will get back to you as soon as possible.