Choose one:

Manufacture a Plane: cost = $6 million dollars per plane. Assume it takes a total of 4 months to build a plane.

Manufacture a Luxury sports Car: cost = $100 Hundred thousand dollars per vehicle. Assume it takes a total of 4 weeks to build a car.

Project must include:

  • Defining the scope of the project. Ch.5a.
  • Create a company System flow chart. Example in Ch.2 lecture notes slide #6.
  • Create a System Development cycle chart. Example in Ch.3a lecture notes slide #7, just phases A, B and C.
  • Create task lists (WBS breakdown structure) Ch. 5a1 lecture notes slide # 13 also book pages 161-164. Add budget per WBS Ch.8 lecture notes slide # 19.
  • Create a production schedule Ch.5a2 lecture notes slides # 9-21.
  • Create / Construct a network diagram for the project. Determine all activities and duration per activity. Ch.6
  • Determine ES, EF, LS and LF Ch.6
  • Indicate the critical path. Ch.6
  • Indicate the total slack of each activity. Ch.6
  • Create a project status report on planned hours per week verse actual hours earned per week.Ch.11
  • Have a least one week where actual hours were below planned hours and create a rework schedule to get back on schedule. Ch.11

"Get 15% discount on your first 3 orders with us"
Use the following coupon
FIRST15

Order Now

Hi there! Click one of our representatives below and we will get back to you as soon as possible.

Chat with us on WhatsApp