A 24-acre site can be purchased. The site is zoned for one-story office development. Zoning allows for lot coverage of 35%, (Paved areas count as… | Cheap Nursing Papers

A 24-acre site can be purchased. The site is zoned for one-story office development. Zoning allows for lot coverage of 35%, (Paved areas count as…

A 24-acre site can be purchased.  The site is zoned for one-story office development.  Zoning allows for lot coverage of 35%, (Paved areas count as coverage in addition to buildings in this zoning code.) and the project requires 165,904 square feet of pavement for parking and vehicle maneuvering.  A general contractor quotes a GMP contract price of $110.00 per square foot, including adequate contingency and contractor’s fee.  Soft costs, including development fee and contingency are $25 per square foot.  Pro-forma rents are $20.00 per square foot (NNN), expenses are $4.00 per square foot and real estate taxes are $5.00 per square foot.  An engineering firm will pre-lease 50,000 square feet of the building at $18.00 per square foot (NNN).  It will take 12 months to build the building and a construction loan is available for 70% of hard and soft costs at an interest rate of 7.5% (interest only).  Assume that the average percentage of the loan that is outstanding for the year-long construction period is 50%.

  1. How big of a building can you build? Blank 1 (round to the nearest square foot) What is the interest expense per square foot in this budget? Blank 2 (do not include a dollar sign and round to the nearest 0.00)
  2. What could you pay for the land per square foot of building to earn 10.5% on cost (assume a 5% overall vacancy factor)? Blank 3(do not include a dollar sign and round to the nearest 0.00)

Based on the information in the previous question: 

  1. What is the average overall NNN rent you could charge to yield 12% if you pay the price for land as answered in (3.) above and vacancy remains at 5%? [4]  (do not include a dollar sign and round to the nearest 0.00)
  2. What is the breakeven occupancy level before debt service at completion and lease-up? [5]  (round to the nearest whole percent e.g. 50%)

"Get 15% discount on your first 3 orders with us"
Use the following coupon
FIRST15

Order Now

Hi there! Click one of our representatives below and we will get back to you as soon as possible.

Chat with us on WhatsApp