1) Leachate and Groundwater Monitoring
a. Why are landfills designed to have a leachate head of 12 inches on the liner? If the leachate head had the potential to build to 24 inches, what is a simple design technique that could relieve the hydraulic pressure on the liner?
b. What are the monitoring requirements for an operational landfill? Include a table to describe what each parameter measures and why knowing this is important.
c. What are the post-closure monitoring requirements? Include a table to describe what each parameter measures and why knowing this is important?
Hi there! Click one of our representatives below and we will get back to you as soon as possible.